Reshaping a Metropolis: Digital Substations Power Sydney’s Growth
As Greater Sydney continues to grow, Endeavour Energy is modernizing its electrical infrastructure to meet rising power demand while improving reliability and operational efficiency. The utility launched a digital substation initiative featuring standardized designs, fiber-optic communications replacing most protection and control copper wiring, and off-site modular construction that reduced construction and commissioning time from three years to under two.
However, digitalization introduced new challenges. Endeavour Energy implemented two independent communication systems with equipment from different suppliers, creating complex interoperability requirements, millisecond-level response demands for process bus communications, and additional vendor coordination challenges.
Working with Moxa, Endeavour Energy deployed industrial networking solutions featuring IEC 61850-3-compliant Ethernet switches that passed UCAIug interoperability testing (IOP). The first modular substation at South Erskine Park achieved approximately 22% CAPEX savings compared with traditional substation development.
Cross-device interoperability: dual sets of devices meant navigating multiple protocols.
Vendor complexity: managing multiple equipment suppliers increased design and deployment complexity.
Millisecond-level response: process bus data needs precise time sync and high bandwidth.
Faster Deployment: modular construction reduced the project timeline from three years to under two.
Approx. 22% Capex reduction savings for South Erskine Park versus traditional substation development.
Projected 58% Opex reduction over 25 years.