Reshaping a Metropolis: Digital Substations Power Sydney’s Growth

As Greater Sydney continues to grow, Endeavour Energy is modernizing its electrical infrastructure to meet rising power demand while improving reliability and operational efficiency. The utility launched a digital substation initiative featuring standardized designs, fiber-optic communications replacing most protection and control copper wiring, and off-site modular construction that reduced construction and commissioning time from three years to under two.

 

However, digitalization introduced new challenges. Endeavour Energy implemented two independent communication systems with equipment from different suppliers, creating complex interoperability requirements, millisecond-level response demands for process bus communications, and additional vendor coordination challenges.

 

Working with Moxa, Endeavour Energy deployed industrial networking solutions featuring IEC 61850-3-compliant Ethernet switches that passed UCAIug interoperability testing (IOP). The first modular substation at South Erskine Park achieved approximately 22% CAPEX savings compared with traditional substation development. 
 

Summary

Challenges

  • Cross-device interoperability: dual sets of devices meant navigating multiple protocols.

  • Vendor complexity: managing multiple equipment suppliers increased design and deployment complexity.

  • Millisecond-level response: process bus data needs precise time sync and high bandwidth.

Results

  • Faster Deployment: modular construction reduced the project timeline from three years to under two.

  • Approx. 22% Capex reduction savings for South Erskine Park versus traditional substation development.

  • Projected 58% Opex reduction over 25 years.

Solutions

  • Energy-specialized local team supported network planning and deployment in Australia.
  • UCAIug IOP-tested PT series switches support RSTP Ring and PRP/HSR networks.
  • Gigabit, IEC 61850-3 compliant switches with IEEE 1588 PTP sync at 0.001 ms accuracy.

About Endeavour Energy

Industry
Utility
Headquarters
Sydney, Australia

Contact us to get more assistance for your business.

Added To Bag
You have some items waiting in your bag; click here to finish your quote!
Feedback